UTE BF SEROPÉDICA

THERMOELETRIC POWER PLANT BAIXADA FLUMINENSE

Category INDUSTRIAL WORK

Customer SKANSKA/PETROBRAS

Work site SEROPÉDICA/RJ

Constructive technology is essential.

One of Zopone’s largest Works, the Thermoelectric Power Plant in Baixada Fluminense – Skanska was a great challenge and achieved amazing numbers, becoming a reference respecting the pre-established deadline. At the peak of the schedule, Zopone employed 800 employees to deliver this work in 16 months. To the energy generation, through the implementation of simple and combined cycles, Zopone executed reinforced concrete structures for boilers, turbines generating energy, transformers, cooling towers, water and sewage stations, industrial buildings to hold equipment and administrative buildings. The work required the use of heavy equipment and new constructive technologies, such as pre-fabricated concrete with low temperature for structures with high volumes.

52.000 m³
excavation

30.700 m²
formwork

1.480 t
steel

16.600 m³
concrete

7.400 m²
constructed area

1.900 m³
precast concrete

250 t
steel structure

VOLTAR AO TOPO